| No | Deskripsi | Qty | Harga | Subtotal | Potongan | Total | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | Terop | 5 | Rp 200.000 | Rp 1.000.000 | Rp 0 | Rp 1.000.000 | |
| 2 | Dekor utama + Photoboat + get utama + Get Lorong + Standing Mirror | 1 | Rp 3.500.000 | Rp 3.500.000 | Rp 0 | Rp 3.500.000 | |
| 3 | Bloking | 50 | Rp 10.000 | Rp 500.000 | Rp 0 | Rp 500.000 | |
| 4 | Meja akad | 1 | Rp 500.000 | Rp 500.000 | Rp 0 | Rp 500.000 | |
| 5 | Shet Prasman | 2 | Rp 400.000 | Rp 800.000 | Rp 0 | Rp 800.000 |
| Subtotal | Rp 6.300.000 |
|---|---|
| Potongan | Rp 0 |
| Total Invoice | Rp 6.300.000 |
| DP / Uang Muka | Rp 0 |
| Sisa Pembayaran | Rp 6.300.000 |